Reed Bed for Kalba Wildlife Center
A reed bed is under construction for the Kalba Wildlife Center. Designed in cooperation with Blumberg- engineers as spezialized sub-consultant for Mott Mac Donald. Reed Bed is designed as single stage vertical flow reed bed split into 2 basins with a 3 chamber septic tank as pre-treatment.
Kalba Reed Bed excavation
Compacted reed bed basins
Installation of liner
Reinforcement work of septic tank